Home EV charging, wired properly.
From a 15 amp point for the charger that came with the car, to a dedicated circuit for a wall charger.
5.0 from 360+ Google reviews
- Covered for lifeon our workmanship
- Family owned35+ years in the trade
- Price firstbefore any work starts
- LicensedQLD contractor licence 92214
The options
- A 15 amp power point for a portable charger
- A dedicated circuit for a wall charger
- Single phase or three phase, to suit the charger
- Your own charger connected and commissioned
- A check that the switchboard has room
- A check that your supply can carry the extra load
How it goes
Tell us about your setup
The car, the charger, where the switchboard is and where you park.
You get options
Usually a simple one and a faster one, each with a price.
We run the circuit
Its own safety switch and breaker, cable sized for the charger.
Tested and certified
You get a certificate of testing and compliance when we finish.
Book a job
Tell us what you need and where. It takes two minutes.
- We call you back the same business day
- You get the price before any work starts
- Rather talk? Call 0485 838 295
Book online
The booking form opens right here on the page. Pop in your address and what you need, and add a photo if it helps.
Open the booking formRather talk? Call us on 0485 838 295.
The Goodfellows guarantee
Five promises we make on every job.
Workmanship covered for life
If our workmanship ever fails, we come back and repair it free.
Two years on materials
Everything we supply carries a two year warranty.
A clean home when we leave
We clean up after ourselves and leave your place as tidy as we found it.
You always know what's happening
Who is coming, when, and what it will cost before any work starts.
Not happy? We put it right
If something about our work isn't right, tell us and we'll come back and sort it.
Common questions
Do I need three phase power?
Not always. It depends on the charger and how fast you want to charge. We'll tell you what your home can support.
I've got solar and a battery. Does that change things?
It can. We check the switchboard has room for the new circuit and that the supply can handle the load before we go ahead.
